  • New Wastewater Treatment Plant!

Photos of Building Progress

IMG_1771.jpeg
previous next
Sheeting on the building is going on trying to get it buttoned up before the weather comes in.
Control Building
Catwalks
Generator Pad
Generator Pad
Electrical Control Room
Control Building
Control Building
Control Building
SBR
SBR Exterior
Control Building Exterior
Control Building Roof
SBR Walls
Generator Pad
HVAC
Control Building
SBR
SBR
Biosolids Room
Control Building
Control Building
IMG_1771.jpeg
Control Building
Equalization Basin
Generator pad
Control Building
Blower room with paint on the walls and pedestals ready for the equipment installation.
The final color of paint is applied in the control building. There will likely need to be touch ups made, But the building is rounding into shape.
last runs of piping from one structure to another getting placed.
The last sections of the sequencing batch reactor walls to be pour are getting formed in.
A look over the sequencing batch reactor looking easting the City of Molalla.
The catwalks around the sequencing batch reactor have started to get formed with a section of it already have its concrete poured.
Control Building drywall has been mudded and the primer coating of paint applied.