Photos of Building Progress

SBR
previous next
From the photo you can see the reinforcing inside one of the sequencing batch reactor cells. The way the walls are constructed the reinforcing has to be installed just right to ensure that the structure holds not only that water that will be treated in it but supports the weight of the structure itself and any attached apparatuses as well.
Control Building
Catwalks
Generator Pad
Generator Pad
Electrical Control Room
Control Building
Control Building
Control Building
SBR
SBR Exterior
Control Building Exterior
Control Building Roof
SBR Walls
Generator Pad
HVAC
Control Building
SBR
SBR
Biosolids Room
Control Building
Control Building
IMG_1771.jpeg
Control Building
Equalization Basin
Generator pad
Control Building
Blower room with paint on the walls and pedestals ready for the equipment installation.
The final color of paint is applied in the control building. There will likely need to be touch ups made, But the building is rounding into shape.
last runs of piping from one structure to another getting placed.
The last sections of the sequencing batch reactor walls to be pour are getting formed in.
A look over the sequencing batch reactor looking easting the City of Molalla.
The catwalks around the sequencing batch reactor have started to get formed with a section of it already have its concrete poured.
Control Building drywall has been mudded and the primer coating of paint applied.