Photos of Building Progress

SBR
previous next
Airline piping run to sequencing batch reactors and aerobic digesters.
Control Building
The Pad for the Blower were poured in place.
Catwalks
Generator Pad
Electrical Control Room
Control Building
Control Building
Control Building
SBR
SBR Exterior
Control Building Exterior
Control Building Roof
SBR Walls
Generator Pad
HVAC
Control Building
SBR
SBR
Biosolids Room
Control Building
Control Building
IMG_1771.jpeg
Control Building
Equalization Basin
Generator pad
Control Building
Blower room with paint on the walls and pedestals ready for the equipment installation.
Operator Room
last runs of piping from one structure to another getting placed.
The last sections of the sequencing batch reactor walls to be pour are getting formed in.
SBR
Catwalks
Control Building
Overview
SBR
Headworks Rebar.jpg
Lab.jpg
FKC.jpg
EQ Basin Walls.jpg
Headworks Forms.jpg
Conduit Runs.jpg
EQ Basin Walls 2.jpg
AD Catwalk.jpg
Blower Piping.jpg
Splitter Box.jpg
Catwalks.JPG
Biosolids Holding.JPG
Blower Room.JPG
EQ Basin Completed.jpg
Headworks Splitter Box.JPG
North Catwalk.JPG