Geotech Drilling
On October 11th and 12th NV5 performed geotechnical drilling to explore and study the soil types across the existing bowling alley site in preparation for design of the new Molalla Police Facility. The findings of these borings will determine how the structure and civil portions of the design will proceed as well as hydrology across the site. This is a great milestone for the project!
Share Geotech Drilling on Facebook
Share Geotech Drilling on Twitter
Share Geotech Drilling on Linkedin
Email Geotech Drilling link
Consultation has concluded