Geotech Drilling

On October 11th and 12th NV5 performed geotechnical drilling to explore and study the soil types across the existing bowling alley site in preparation for design of the new Molalla Police Facility. The findings of these borings will determine how the structure and civil portions of the design will proceed as well as hydrology across the site. This is a great milestone for the project!

Share Geotech Drilling on Facebook Share Geotech Drilling on Twitter Share Geotech Drilling on Linkedin Email Geotech Drilling link

Consultation has concluded

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>